underwater
  Safety Information   Installing SureLock Weight Pouches
  Dealer Inspection and Service   Inflation Methods using the i3 System
  Warranty Information   Deflation Methods using the i3 System
Basic Setup   Special Features
  Donning and Adjustment Procedures   Predive Inspection (i3 Inflation System)
  Weight Integration Features   Postdive Care and Maintenance

Attaching the MP Hose to the First Stage

1.  Remove the inflator hose from the power inflator body by gripping the grooved sleeve over the quick disconnect coupling with your thumb and forefinger. Slide the sleeve back.


2.  Remove the port plug from an MP port on the regulator using an appropriately sized wrench.
warning WARNING: DO NOT connect the inflator hose to a high pressure (HP) port (greater than 200 psi / 14 bar). This may cause the hose to burst when pressurized, which can result in serious injury. If you are unsure which regulator port is medium pressure (MP) or high pressure (HP), consult your regulator owner’s manual or your dealer before attaching the hose.

3.  Check to ensure the o-ring is present and in good condition. Screw the threaded end of the hose into the port and tighten to 40 in/lbs (46 kg/cm) with a 9/16" wrench.